since EVERYONE is asking this is number ten:
Place long one at the very bottom middle(under the 1-2-1 pipes) The place the tall one on top of the middle of the long one(sounds a little complicated) then put the tubes |_ and _| on the sides going into the bottom of the long one. then finally add the tube _| on the right-middle...ish (1)
and there you have it!